Final Project: Bobwhite-Manatee Transmission Line


The Final Project finally came! For our last assignment, we were to run an analysis on whether or not the location of the Bobwhite-Manatee Transmission Line was viable. The objectives were to make sure the surrounding communities, land owners, and environmental lands were impacted as minimally as possible. After collecting the data, producing maps, and analyzing multiple queries and selections, I deduced that the location was definitely in an ideal location. Please check out my powerpoint and read the transcript below to get a more in depth interpretation of this project. Thank you!

Powerpoint Link
https://drive.google.com/open?id=1XsPi3kEvjDej-EzFN1T-VzZX_Zjgndtc

Transcript Link
https://drive.google.com/open?id=1K2PB1fpjq7ry4sOKYcB9Viq7CTFhK9hH